top of page
canberra-accomodation-attractions-war-memorial-1500x880 (1).png

FEATURED PROJECT

Australian War Memorial

ArchitecturalConcrete.png
ARCHITECTURAL CONCRETE

Limited only to your imagination. Benchtops, BBQ areas, floating stairs, fireplaces and feature pieces. First class finishes in any shape or size.

consulting.png
CONSULTING

Identifying project cost overruns before they occur. From conceptual design to practical completion, we can assist in providing innovative structural solutions for any project.

ConcreteRepairs.png
CONCRETE REPAIRS

Typically you only get one shot when casting concrete, now you get two. Our team have the tools and experience to fix a range of defects. Whether it's major structural repairs, concrete resurfacing or a simple tidy up we can fix it.

DesignAndConstruct.png
DESIGN AND CONSTRUCT

Let us do the thinking, structures are our specialty. We understand the importance of the design phase to ensure a seamless delivery of a project. We know what works, what is efficient and where to save money.

formwork.png
FORMWORK

Our staple. Specializing in the unconventional, no task is too complex. Suspended slabs, walls, stairs, permanent decking, capping beams and proprietary systems. We know how to handle the pressure of concrete.

FRPPackages.png
FRP PACKAGES

Form. Reo. Pour. The full service, save yourself the headache and consolidate your structure into one point of contact.

AWM, Concrete, architectural, structural service, engineering, design, complex, building, carpentry, formwork, reinforcement,

This project was a defining opportunity for Flush Formwork, serving as a perfect showcase of our extensive capabilities. It stands as a reflection of our commitment to quality, craftsmanship, and innovative practices.

    New Southern Entry

This area featured more than 4,500m² of architecturally designed suspended slabs and over 6,500m² of formed wall faces. We also constructed a new amphitheater with curved, tiered seating poured in situ, over 1,700m² of curved columns, 1,000m of stair risers, and multiple architectural feature pieces.

    Main Building Works

Included extensive formwork, reinforcement, and pouring (FRP) works for multiple new areas. This also involved constructing two lift shafts built from the top down while acting as structural underpinning to the existing building—a complex process that required precision and careful planning.

    New Parade Ground

Over 800m² of formed wall faces and 200m of stair risers, creating a striking new space for ceremonial events.

Our formwork package for the Australian War Memorial was a significant and challenging project that showcases our expertise and ability to scale. This featured extensive complex concrete works and significant additions all within a historically sensitive environment. The scope included:

The Australian War Memorial redevelopment was more than just a project, it was a showcase of what can be achieved when faced with complex and unique challenges.

 

Every element was built to the highest standards and every hurdle overcome.

 

The success of this project is a direct reflection of our expertise, innovation and dedication to delivering exceptional results.

The significant structural challenges required advanced construction techniques, and the completed works ensure that the Memorial remains a place of national significance, with enhanced facilities that respect and preserve its historical importance.

AWM, Concrete, architectural, structural service, engineering, design, complex, building, carpentry, formwork, reinforcement,
AWM, Concrete, architectural, structural service, engineering, design, complex, building, carpentry, formwork, reinforcement,
AWM, Concrete, architectural, structural service, engineering, design, complex, building, carpentry, formwork, reinforcement,
bottom of page